Download the HealthEast Success Story

As a result of the cost savings, HealthEast is on track to recover its project investment within 14 months.


The server virtualization and consolidation project brought an immediate and dramatic response to HeathEast’s top concerns:

  • A 40% reduction in data center power consumption
  • Dramatically decreased utilization of data center space, plus
    mitigation of future expansion needs
  • Improved application performance
  • Strengthened business continuity and disaster recovery capabilities
  • Less IT staff time diverted to managing servers

Download the HealthEast Success Story